Sunday, October 28, 2007

Prime time in November

We called Julia and Ken at Fernwood last week and they feel that Derwent6 will be going over to them in the middle of November. (but we still feel it will be a bit longer than that)
We also called Jim at Alexander boats and he has the shell now ready, all bar fitting the doors, tiller, and blacking and priming. So we had to go up to check the tiller height and take more pictures.



Check out this video of the full length of Derwent6 showing the houdini hatches fitted, the centre ring and the fender ties all fitted. we are really pleased with the shape and workmanship.

The houdini frame work has been fitted as low as possible and looks very neat.





The Fender eyes are all now welded into place and the centre rope eye fitted (which is a little bit forward of centre), so it will be a bit easier to pull the front in.









As for the Stern, the rear sides are now fitted and the stern deck completed.

We then had to check out the tiller height and the seating position on the roof.



Jim won't prime Derwent6 until he gets the nod from Fernwood and he gets a moving date because of the muck floating around the workshop could still cause rust.


Meanwhile, no news on the house sale front (but no rush as you can see) and we are now in Christmas shopping mode. Ho Ho Ho!

Saturday, October 13, 2007

Down to the finishing touches

We have been busy over these last few weeks due to the fact we have been marketing the house and keeping it spic and span. We have had some interest with one offer, but not sold yet.

As far as the plans for the boat we have been looking at electrical items such as where the lights will be positioned, and also the 240v sockets and wiring etc.




We have now sourced the slate tiles for behind the Morso squirrel wood burner, and been up to the midlands to collect them, they just look fab, we are so pleased.....



We have been back up to Fernwood and seen the boats in progress. They are all working very hard to get the two boats in front of us out, but not fast enough for us, as we are so excited because Jim at Alexander boats is putting all the finishing touches to the Derwent6 Hull.(Come on Fernwood)

I must say though, the boats Fernwood are working on, just look fantastic, with loads of features on all of them. We just feel that when we come away, Derwent6 will be another one or two weeks behind (thank goodness our slot came forward).



We then went on to see our new home. Jim has had his own problems with his team mate Craig, having a trauma in the family, and having to fly out to Spain to sort it all out.



Our Condolence's Craig.




Jim has not been feeling too good himself, but they have still battled on. As for progress, the gas locker hatch has been done. All the plates have been cut for the Houdini hatches, and the roof rails finished including the smooth finishing of the side grab rails, so as not to take your finger nails off when moving down the side of the boat.

While we was there, Jim was making the eyelets for the side fenders so we could check them for size, they were perfect....
Just before we left Craig and Jim, they showed us a picture that one of thier Kingsground customers had brought in, showing Jim and their build, and ain't it just great.




Saturday, September 29, 2007

Why Derwent6 !


We have had a lot of comments as to why we have called this narrowboat Derwent6... so to make it clearer to everyone here goes.


When we brought our first house we looked on a new housing estate and fell in love with one of them. Now! you know they call all these new houses different names, well our one was called Derwent. We lived happily for 10 years calling this house Derwent until another new housing estate was established just up the road with detached opportunities. This house was No.6 and because we have been so happy in our last house decided to name it Derwent. We even put up a plaque with Derwent on it, with the house number 6 underneath. We have been very happy there for 14 years until we decided to live on a narrowboat...hence the name (all one word) Derwent6.

Thursday, September 27, 2007

Fernwood planning

We went up to Fernwood craft this week to discuss the planning for Derwent6, and also find out how they are getting on with the work in progress.

They certainly know how to produce a Wow factor boat, with the four they have in the workshop, at the moment.

Julia sat us down and we went through the fundamentals of the boat, talking about water and waste tanks (with a coffee of course). We then talked about colours and fabrics for the bathroom and dining room, but Julia still hadn't got the feeling we had with the colours.



We then went and looked at the new concept boat (Whitefields) and it is coming along nicely.
You can check this out on Fernwood's website www.fernwoodcraft.co.uk . It's a nice boat, but a bit complicated (to many things to go wrong), but it just shows what Fernwood can do.

We then showed Julia the samples for the saloon and dining room, and suddenly, Julia could see where we were coming from, with all the warm colours blending through Derwent6.

We are hoping that Derwent6 will enter their workshop in about 3 weeks....Jim has about a weeks work, so he will hold onto the hull, until Fernwood need it. We will go back up to Jim just before the hull is primed for transportation, and we will be there with the camera.

Sunday, September 23, 2007

Jim's bit of fancy

Jim has had to slow down a bit on Derwent6 due to the fact that Fernwood can't get the hull into them for a least another two weeks, but it has given him the time to get all the fancy bits right on the stern deck, roof cutouts and rails.


The port and starboard side doors have now been fitted and the stern rear door bulkhead is in.












Alexander Boat's said this boat would be ready for the end of September, and Jim has delivered.

His Quality has been second to none, and the care you can see on the final touches.



All that is needed now are for the Houdini hatches and the doors to be fitted. There is some final straightening up to do, and then Derwent6 will be blackened and primed for Fernwood.

We are off to Fernwood this week to check on progress and go through the fundamentals with Ken and Julia.

Sunday, September 09, 2007

Sides are up !

WoW!!!! Jim has really been getting on with Derwent6 with the cabin sides now up, and the roof on.
You can see from this picture, that Jim has done the design of the curved sides which protect you from the wind when sitting in the cratch. You can also see the cutouts in the roof, which is where the fenders will hang, so you can rake off the leaves on that Autumnal evening.




The cratch lockers are in and gas bottle fixings.


Jim here is showing us how big the portholes are, but this one will end up being a side door in the galley, next time we go up.






The weed hatch and fuel tank have been fitted. The fuel tank has been extended to take 50 gallons (250 litres). You can see the fuel feed and return pipes and this had already been tested.
On the lower right of the picture you can see the engine cooling radiator, which does not have fins due to the fact it will be under the water line and cooled by the swim.




The roof is now on and the roof rails fitted. Jim has got the lines and the arch of the roof just right here. Another set of side doors will go where the roof rail ends on the port side (left) in this picture.


We are both so pleased we chose Alexander boats as you can see from the pictures, the Quality is fantastic.



Monday, August 27, 2007

Back to Back

What we mean is, we went back up to Jim, to see the new stern (the back) on Derwent6
and don't she look wonderful...............

When we got there, Craig was just finishing the welding around the stern (which has to be water tight we must add) and a fine job he made of it.

Jim has really helped out with fitting extra bits and pieces, like he fitted a 10mm steel brace to the engine bay with stabilizer braces to help on the vibration from the engine.



From this shot you can see the radiator is fitted and Jim is going to extend the Diesel tank which will fit around the swim, just above the radiator.

The well deck has been dropped down to as low as it can go, and is now in. Jim has now got to put in the lockers which he had left, because he wanted to confirm with us their final position.


Jim has also rolled over the floor ribs at the bow under the well deck to let us get a bigger stainless steel water tank in. (we will need it)



Here are some other photos taken while we were there.........





We are so pleased with the progress so far, and we know Jim and Craig were too. This gave us a good feeling as we left for the IWA festival at St Ives.




And what a mud bath it was !!!!!!!!!


We ended up taking our shoes off and stomping around in bare feet, nice!!


We didn't feel like buying anything because it would have got so muddy, and we certainly didn't want to stomp around in those poor peoples new boats. You would have thought some straw or matting could have been found earlier.


but, we still enjoyed the day and had a good look at all the boats along the river Ouse, chatting to everyone including Sarah on n.b.Warrior..........Hi Sarah nice to meet you.


This time next year we could be here with Derwent6.....................

Wednesday, August 22, 2007

Mobile to Blog


Jim at Alexander Boats has not only mastered the camera, but can now send us pictures of the build in progress (well done Jim!)

We are going up to see for ourselves the progress, but its great to see pictures before we go up.
This weekend we're off to the IWA at St Ives, with a list of items we need to buy.... so if anyone else is going let us know and we will meet up for a beer or two.
As for the house, we have been doing some decorating Uuk!, and a bit more sorting for the house contents sale.
We will update more over the coming weekend with the latest pictures.

Saturday, August 11, 2007

Going up for a swim!

Derwent6 is now built up to the swim, the swim being the fish tail bit that goes on the stern.



We could not wait to get up to Jim to see the progress and was pleased with the quality of workmanship.

As for the Bow, he has now done the gas locker table and the fancy nose lines. It is all taking shape nicely, but Jim still said he has to straighten her up before the stern floor and cabin sides can be fitted. You can now see the 65 foot length and there is still the stern deck to be added.
As you can see the Bow bulkhead is now up and Jim has added in the extra lip on the bottom of the doors as we are dropping the floor as low as we can get it.

We still can't believe this will be our home, but the good news is it did look long in the workshop.


You can see the shape now coming together.
You won't need to put a spirit level against the bow bulkhead, as you can see it's square by this picture.

This is Al dreaming that Derwent6 was finished.

As for the house we are busy decorating rooms and sorting out solicitors. We will be back up to Alexander Boats, Friday week........ more then !!

Sunday, July 29, 2007

Do it, do it now !!!!

"Twenty years from now you will be more disappointed by the things you didn't do than by the ones you did do. So throw off the bowlines. Sail away from the safe harbor. Catch the trade winds in your sails. Explore. Dream. Discover"

Mark Twain