In the bedroom the top has been done to the chest of drawers and the headboard infills have been done.
In the galley the two cupboards going on the bulkhead have been made up and as you can see from the drawings should look fab.
In the bedroom the top has been done to the chest of drawers and the headboard infills have been done.
In the galley on the starboard side, the tap and splashback has been fitted, and plug sockets and butler sink drainer installed. Also the integrated fridge has been fitted.
In the Dayroom the corner cabinet has been started by Chris and should look great when finished. Behind this, will fit the perspex and fly screens for the side doors.
We were very lucky with the price as they let us have it for last years price's and as we collected it there were no delivery charge's. This anchor can be used with weighted rope, so a chain does'nt have to be used. They also threw in a key saver floating key fob, Good service don't you think!
As for Derwent6 and Fernwood, we are up to the boat next week to see the progress, and we can't wait!!!!!
And on Sunday (for a change) we saw a group called Show of Hands who are a Folk group who perform at a lot of the festivals around the canals. They were performing in Sevenoaks, a town local to us in Kent and were brilliant !!!!!
The galley units are now being installed, so we are now getting a feel of the size of drawers and cupboards in this area. The bed was being erected out in the workshop as was the dayroom furniture.
The engine has now been placed in position (dry fit) and the centaflex coupling fitted. This engine is a kabota which has been tried and tested for many years normally on building site machinery, but this one has be marinated by Beta and will be the heart of Derwent6. Attached to the engine is a 5kv Generator which will give the 230 volt power to all the appliances.